Construction site management and coordination
The management and organization of complex construction sites are linked to the need to create greater continuity between the project phase and the construction phase. The difficulty in managing construction sites is inherent in the transition from design to construction. The attention to the construction aspect must start from the design phase in order to be able to plan the construction of the building site
Operational phases
-
Reading of the technical project and elaborations of modifications if necessary
-
Choice of materials and technical solutions to adopt
-
Drafting of the metric calculation
-
Creation of an organizational plan elaborated and managed in compliance with the timing defined by the project
-
Development of a procurement planraw material.
-
Tracking of the construction work
-
Periodic verification of the progress of the works
-
Quality control of the completed work
-
Cost accounting
-
Verification of correct accounting of costs